File | $Source: /home/juda/www/hrc_flight/RCS/sh1tosh2.html,v $ |
Version | $Revision: 1.3 $ |
Last Update | $Date: 1999/05/10 18:08:08 $ |
HRC CCB Status | Approved |
OP03 Procedures | op03: |
High-level pulse commands are used to select the B-side preamps for PMT#1 and the A-side for PMT#2.
If PMT #2 is intended to be used, its HV power supply must be turned on after the configuration is changed using either sh2_act.html or sh2_on_and_up.html.
Delta-Time | Command Mnemonic | Description | Cmd Field Mnemonic | Data Parameter | Telemetry Verifier | Expected Value | Notes |
---|---|---|---|---|---|---|---|
Verify that both PMT HV power supplies are off | |||||||
00:00:01.000 | 2PRB1SL | Shield PMT#1 select to use CEA B electronics | 2ELEBSS | PMT1 | hlp7c | ||
00:00:01.000 | 2PRA2SL | Shield PMT#2 select to use CEA A electronics | 2ELEASS | PMT2 | hlp3d |
$Log: sh1tosh2.html,v $
Revision 1.3 1999/05/10 18:08:08 jhc
corrected initial time delay to 1 sec
Revision 1.2 1999/04/22 15:38:37 juda
Corrected description of what the commands do (switch amplifier outputs to designated CEA). Added comment about which sequences to run to raise the PMT HV.
Marked as Approved
Revision 1.1 1998/12/04 21:31:15 juda
Initial revision
Dr. Michael
Juda
Harvard-Smithsonian Center for Astrophysics
60 Garden Street, Mail Stop 70
Cambridge, MA 02138, USA
Ph.: (617) 495-7062
Fax: (617) 495-7356
E-mail: mjuda@cfa.harvard.edu