This sequence starts by setting the HV level for the anticoincidence shield photomultiplier tube (PMT) to its minimum value and then turns on the HVPS. After verifying that it is OK to proceed, the HV is raised to the operational level
Using PMT#2 is now standard operation; the signal amplifier configuration must be changed from the one established by Power Up HRC on CEA A - SCS #69 before this procedure is executed.
Delta-Time | Command Mnemonic | Description | Cmd Field Mnemonic | Data Parameter | Telemetry Verifier | Expected Value | Notes |
---|---|---|---|---|---|---|---|
Verify with Science Team that it is OK to proceed | |||||||
00:00:01.000 | 2S2STHV | Set shield PMT#2 HVPS step to 0 | 2S2STHV2 | 0 | 2S2HVST | 0 | sd0e00 |
Verify PMT#2 HV Settings and Analog Monitors | |||||||
Wait for Science Team Approval to Proceed | |||||||
00:00:01.000 | 2S2HVON | Turn on PMT#2 HVPS | 2S2ONST | ON | sd0d01 | ||
Verify PMT#2 HV Settings and Analog Monitors | |||||||
Wait for Science Team Approval to Proceed | |||||||
00:00:01.000 | 2S2STHV | Set shield PMT#2 HVPS step to 4 | 2S2STHV2 | 4 | 2S2HVST | 4 | sd0e04 |
Verify PMT#2 HV Settings and Analog Monitors | |||||||
Wait for Science Team Approval to Proceed | |||||||
00:00:01.000 | 2S2STHV | Set shield PMT#2 HVPS step to 8 | 2S2STHV2 | 8 | 2S2HVST | 8 | sd0e08 |
$Log: sh2_act.html,v $
Revision 1.4 1999/05/10 18:08:08 jhc
corrected initial time delay to 1 sec
Revision 1.3 1998/11/06 22:19:16 juda
Marked as "Approved"
Revision 1.2 1998/06/01 12:28:46 juda
Added a "wait" between inital setting of HV step to 0 and HV turn-on
Revision 1.1 1998/05/20 19:25:45 juda
Initial revision
Dr. Michael
Juda
Harvard-Smithsonian Center for Astrophysics
60 Garden Street, Mail Stop 70
Cambridge, MA 02138, USA
Ph.: (617) 495-7062
Fax: (617) 495-7356
E-mail: mjuda@cfa.harvard.edu