OP03 Procedures | op03: |
Once this procedure is complete the instrument can be returned to normal operation.
$Log: cal_failsafe.html,v $
Revision 1.3 1999/03/03 21:54:51 juda
changed links for files with name changes
Revision 1.2 1998/11/18 15:34:49 juda
removed steps for powering down the HRC - added positioning the door to use the cal source and opening it at the end
Revision 1.1 1998/11/04 13:59:59 juda
Initial revision