File $Source: /home/juda/www/hrc_flight/macros/RCS/rad_zone_exit.html,v $
Version $Revision: 1.4 $
Last Update $Date: 1999/04/21 13:30:19 $
HRC CCB Status Approved

OP03 Procedures op03:

HRC Higher-Level Sequences

Radiation Zone Exit

Description:

This sequence restablishes operation of the HRC detector after exiting the radiation zone. The antico shield PMT#2 HV is turned on and raised to the operational level. Then the MCP HV ramp-up sequence for the active detector is enabled.

Cautions/Restrictions:

The RADMON process in the OBC must be enabled before this procedure can be run.

Flow Diagram

Procedure


$Log: rad_zone_exit.html,v $

Revision 1.4 1999/04/21 13:30:19 juda

marked as Approved

Revision 1.3 1998/12/15 17:18:15 juda

added logic branch for case with HRC not at HRMA aim-point -- added HTML page names to link names in procedure list

Revision 1.2 1998/11/19 14:02:26 juda

added flow diagram

Revision 1.1 1998/10/15 20:15:46 juda

Initial revision


Dr. Michael Juda
Harvard-Smithsonian Center for Astrophysics
60 Garden Street, Mail Stop 70
Cambridge, MA 02138, USA
Ph.: (617) 495-7062
Fax: (617) 495-7356
E-mail: mjuda@cfa.harvard.edu