Version $Revision: 1.4 $
Last Update $Date: 2001/11/08 14:46:10 $
HRC CCB Status not reviewed

AXAF Constraints, Restrictions, & Limitations

Number: HRC-R-001

Type: Restriction

Original Date: 1/30/97


Subsystem: HRC

Subject: Lowered MCP HV When Slewing

Source: Informal CARD inputs, e-mail, M. Juda, 9/11/95


CRL Statement:

The Observatory must not slew over bright (200 counts/sec imaged) X-ray sources if the HRC is at the aim-point and the MCP HV is set to the operating level.


CRL Rationale/Justification:

The HRC sensitivity to bright objects is derived from the HRC design. A localized region on the HRC MCPs that receives a dose of more than 500 events per MCP channel undergoes a permanent reduction in gain of 10%; increasing dose above this leads to further reduction in gain. Slews across bright sources must be avoided or, alternatively, the MCP HV voltage level must be lowered for these slews.


CRL Impact:

The high counting rates (200 count/sec imaged) generated by bright sources will permanently degrade HRC MCP performance in regions where the source is imaged.


Recommended Action:

Incorporate into the Systems and Operations Procedures, with ASC providing the input, Operations Database, and the OFLS.


$Log: hrc-r-001.html,v $

Revision 1.4 2001/11/08 14:46:10 juda

HTML "href" tag edits to convert to soft links

Revision 1.3 1999/01/20 20:26:19 juda

removed TBSs

Revision 1.2 1998/04/27 13:56:36 juda

Added Version table

modified 1998 March 16


Page created 1998 March 4 - Based on 30 Jan 98 release of OP05


Dr. Michael Juda
Harvard-Smithsonian Center for Astrophysics
60 Garden Street, Mail Stop 70
Cambridge, MA 02138, USA
Ph.: (617) 495-7062
Fax: (617) 495-7356
E-mail: mjuda@cfa.harvard.edu