|
NOTE: This tool is not needed for observation data
which was processed or reprocessed after 2003-Dec-31. In this case the current
aspect alignment calibration has already been applied. Check the DATE
FITS header keyword in the event file to determine the processing date.
Caveat: Chandra observations taken after about 2006-Dec-01 and
processed on or before 2007-May-14 are subject to a systematic aspect offset of
approximately 0.4 arcsec. New calibration files to correct this offset were
installed effective 2007-May-14 and affected observations were reprocessed to
remove the offset. Observers analyzing these observations should ensure that
the processing date is after 2007-May-14.
|